| 1 |
Const of Shingle road in GB-II Kharmang |
Final Evaluation Report |
XEN B&R Division Kharmang |
11-11-2024 |
30-11-2024 |
|
|
|
| 2 |
Construction of District Account Office Kharmang |
Final Evaluation Report |
XEN B&R Division Kharmang |
20-11-2024 |
20-12-2024 |
|
|
|
| 3 |
Const of Shingle road IN GB-II Kharmang |
Final Evaluation Report |
XEN B&R Division Kharmang |
11-11-2024 |
30-11-2024 |
|
|
|
| 4 |
Const of court office & add Dsitrict & Session Judge Skd, SHigar and Kharmand and Civil Court Yasin |
Final Evaluation Report |
XEN B&R Division Kharmang |
18-11-2024 |
03-12-2024 |
|
|
|
| 5 |
Const of link road from Kamngo Gons i/c Side drain RCC culverts and RCC pipe (portion 1) |
Final Evaluation Report |
XEN B&R Division Kharmang |
11-11-2024 |
30-11-2024 |
|
|
|
| 6 |
Repair of Machinery for maintenance roads in Astore |
Final Evaluation Report |
XEN B&R Division Astore |
01-12-2024 |
16-12-2024 |
|
|
|
| 7 |
Disposal of Surplus Excavated Material |
Final Evaluation Report |
D.G Gilgit Development Authority |
20-12-2024 |
04-01-2025 |
|
|
|
| 8 |
Procurement of road making machinery and snow removing heavy machinery for Baltistan Division |
Final Evaluation Report |
XEN B&R Division Skardu |
30-12-2024 |
14-01-2025 |
|
|
|
| 9 |
Const of SP Office at Kharmang |
Final Evaluation Report |
XEN B&R Division Kharmang |
01-01-2025 |
16-01-2025 |
|
|
|
| 10 |
Construction of Road from “Thalichi to Gorikot" |
Final Evaluation Report |
Project Director, Inter Provincial Connectivity Economic Corridor (GB) |
04-01-2025 |
19-01-2025 |
|
|
|
| 11 |
Const. of 1000 rft road from Imambargah toq to Choghumbo Link Road Olding Skardu and 1.3 KM Road from Public school to onward Sadpara |
Final Evaluation Report |
XEN B&R Division Skardu |
07-01-2025 |
22-01-2025 |
|
|
|
| 12 |
Const. and Improvement of link road in whole Roundu Area |
Final Evaluation Report |
XEN B&R Division Skardu |
07-01-2025 |
22-01-2025 |
|
|
|
| 13 |
Re-carpeting of 1.4 KM Road from Benazir Chowk to Bhutto Bazar Kudad House Skardu |
Final Evaluation Report |
XEN B&R Division Skardu |
07-01-2025 |
22-01-2025 |
|
|
|
| 14 |
Imp/widening and metaling of existing road from road from Radio Pakistan CHowk to RCC Bridge at Hargisa (Through Paver Machine) |
Final Evaluation Report |
XEN B&R Division Skardu |
07-01-2025 |
22-01-2025 |
|
|
|
| 15 |
Completion of Remaining work of Govt. Residential Quarters (Cat-III Block-C Jutial Gilgit) |
Final Evaluation Report |
XEN Building Division Gilgit |
13-01-2025 |
28-01-2025 |
|
|
|
| 16 |
Completion of Remaining work of Govt Residential Quarters (CAT-III Block-A Jutial Gilgit) |
Final Evaluation Report |
XEN Building Division Gilgit |
13-01-2025 |
30-01-2025 |
|
|
|
| 17 |
Construction of Boundary Wall, Main Gates, Service Road & Guard Room (Establishment of M&NC College at Gilgit) |
Final Evaluation Report |
Project Director, Medical and Nursing College, Gilgit |
20-01-2025 |
04-02-2025 |
|
|
|
| 18 |
Procurement of Biomedical Equipment for 50 Bedded Cardiac Hospital Gilgit |
Final Evaluation Report |
Medical Superintendent Cardiac Hospital Gilgit |
24-01-2025 |
08-02-2025 |
|
|
|
| 19 |
Const of C Class Dispensary at Kosoro Kharmang |
Final Evaluation Report |
XEN B&R Division Kharmang |
31-01-2025 |
15-02-2025 |
|
|
|
| 20 |
Feasibility Study for Construction of RCC Bridges Basho over indus river |
Final Evaluation Report |
XEN B&R Division Kharmang |
27-01-2025 |
12-02-2025 |
|
|
|
| 21 |
Provision of Water Supply Serlling Kazborthang Phase-II |
Final Evaluation Report |
XEN B&R Division Kharmang |
24-01-2025 |
08-02-2025 |
|
|
|
| 22 |
Up-gradation of 30 bedded Hospital into 50 bedded DHQ Hospital Aliabad Hunza |
Final Evaluation Report |
XEN B&R Division Hunza |
10-02-2025 |
25-02-2025 |
|
|
|
| 23 |
Civil Works |
Final Evaluation Report |
XEN B&R Division Astore |
10-02-2025 |
25-02-2025 |
|
|
|
| 24 |
Construction of 4.75 KM link road from Sost Dry port to Hussain Tunnel at Gojal Hunza |
Final Evaluation Report |
XEN B&R Division Hunza |
10-02-2025 |
25-02-2025 |
|
|
|
| 25 |
OFFICE EQUIPMENT / FURNITURE AND FIXTURE |
Final Evaluation Report |
Superintendent of Police (Special Protection Unit) Gilgit |
26-02-2025 |
14-03-2025 |
|
|
|
| 26 |
Construction of link road in W-6 Hunza |
Final Evaluation Report |
XEN B&R Division Hunza |
26-02-2025 |
31-03-2025 |
|
|
|
| 27 |
Civil Works |
Final Evaluation Report |
XEN Building Division Gilgit |
06-03-2025 |
15-03-2025 |
|
|
|
| 28 |
Construction of link road from Karimabad Ali road to Dawn Public School at Hydarabad Hunza |
Final Evaluation Report |
XEN B&R Division Hunza |
10-03-2025 |
25-03-2025 |
|
|
|
| 29 |
Const. of 16.5ft wide link road from Mirza Hassan land to Javed Alam road to Al-Murtaza School Murtazaabad Hunza |
Final Evaluation Report |
XEN B&R Division Hunza |
10-03-2025 |
25-03-2025 |
|
|
|
| 30 |
Const. of Shingle road in GB-II Kharmang |
Final Evaluation Report |
XEN B&R Division Kharmang |
12-03-2025 |
28-03-2025 |
|
|
|
| 31 |
Repair & Maintenance of Machinery |
Final Evaluation Report |
XEN B&R Division Astore |
19-03-2025 |
03-04-2025 |
|
|
|
| 32 |
Const./Imp/Re-alignment of road in Kharmang |
Final Evaluation Report |
XEN B&R Division Kharmang |
25-03-2025 |
11-04-2025 |
|
|
|
| 33 |
Vehicle Safety Assurance Certification System (VSACS) in GB |
Final Evaluation Report |
Deputy Director Excise & Taxation Gilgit |
26-03-2025 |
11-04-2025 |
|
|
|
| 34 |
Repair/Maint. of Govt. Machinery |
Final Evaluation Report |
XEN B&R Division Astore |
09-04-2025 |
24-04-2025 |
|
|
|
| 35 |
Rehabilitation of Sewerage System District Headquarter Aliabad Hunza |
Final Evaluation Report |
Executive Engineer LG&RD Hunza |
11-04-2025 |
26-04-2025 |
|
|
|
| 36 |
construction of 02 Km Link roads in Chilas City |
Final Evaluation Report |
XEN B&R Division Chilas |
11-04-2025 |
26-04-2025 |
|
|
|
| 37 |
Construction of Link Roads in Darel/Khanbary & Dodoshal |
Final Evaluation Report |
XEN B&R Division Chilas |
11-04-2025 |
26-04-2025 |
|
|
|
| 38 |
Metaling of Road Gichi Valley Chilas |
Final Evaluation Report |
XEN B&R Division Chilas |
11-04-2025 |
26-04-2025 |
|
|
|
| 39 |
Const. of Road from Chumik Bridge to Lamsa Shigar Via New Skardu City PH-I (Revised) |
Final Evaluation Report |
XEN B&R Division Shigar |
16-04-2025 |
02-05-2025 |
|
|
|
| 40 |
Const. of 02 Nos Green Godown at Hudur Nrae Madarsa Gujrat, Sari Thore |
Final Evaluation Report |
XEN B&R Division Chilas |
21-04-2025 |
06-05-2025 |
|
|
|
| 41 |
Feasibility Study of Delta Bridge at Kharmang Khas and Hamzigound and Truckable road from Pari to Changnmer GBA-11 Kharmang |
Final Evaluation Report |
XEN B&R Division Kharmang |
23-04-2025 |
08-05-2025 |
|
|
|
| 42 |
CONSTRUCTION /IMPROVEMENT /WIDENING & RIDID PAVEMENT FROM JUTY TO KALA PANI I/C CONVERSION / RE-ALIGNMENT OF 2KM ROAD REPELLING POINT TO SHUNIGAI I/C 01 NO RCC BRIDGE 40 MTR SPAN ASTORE.(PACKAGE-I) (CONSTRUCTION /WIDENING & RIGID PAVEMENT OF ROAD etc |
Final Evaluation Report |
XEN B&R Division Astore |
24-04-2025 |
10-05-2025 |
|
|
|
| 43 |
Sewerage System for 2 UCs Nagar Proper and Hoper Phase-I |
Final Evaluation Report |
Executive Engineer LG&RD Nagar |
02-05-2025 |
18-05-2025 |
|
|
|
| 44 |
Extension of GBWMC Fleet (Ph.I) |
Final Evaluation Report |
Executive Engineer LG&RD Gilgit |
07-05-2025 |
23-05-2025 |
|
|
|
| 45 |
Const. of 02 Nos Green Godown at Hudur Nrae Madarsa (Const. of 01 No. Grain Godown at Sari Throre) |
Final Evaluation Report |
XEN B&R Division Chilas |
08-05-2025 |
23-05-2025 |
|
|
|
| 46 |
Missing Facilities for PHQ Hospital Gilgit |
Final Evaluation Report |
Medical Superintendent District Headquar Hospital Gilgit |
13-05-2025 |
29-05-2025 |
|
|
|
| 47 |
Supply, Commissioning & Configuration of Firewalls, Networking & Installations for E-office in Gilgit-Baltistan |
Final Evaluation Report |
Performance Management and Reforms Unit (PMRU) Gilgit |
16-05-2025 |
02-06-2025 |
|
|
|
| 48 |
Up-gradation / Repair Maintenance CM Camp Office Kachura |
Final Evaluation Report |
XEN B&R Division Skardu |
19-05-2025 |
04-06-2025 |
|
|
|
| 49 |
Const./Metaling of Various Link Road in GBLA-8 Skardu |
Final Evaluation Report |
XEN B&R Division Skardu |
19-05-2025 |
04-06-2025 |
|
|
|
| 50 |
Const. and Metaling of Road from Main Road to 250 Bedded Hospital Skardu |
Final Evaluation Report |
XEN B&R Division Skardu |
19-05-2025 |
04-06-2025 |
|
|
|
| 51 |
Development of BCC Print Materials, Pretesting of BCC Materials and Production of BCC Print Materials |
Final Evaluation Report |
Provincial Coordinator FP & PHC GB |
21-05-2025 |
05-06-2025 |
|
|
|
| 52 |
Production of TV Spots/Radio Messages/ Short Video Documentary & Airing/Dissemination Broadcast of Messages on TV, Cable Networks, Radio and Social Media |
Final Evaluation Report |
Provincial Coordinator FP & PHC GB |
21-05-2025 |
05-06-2025 |
|
|
|
| 53 |
Establishment of P&DD Divisional Office Diamer Astore Division |
Final Evaluation Report |
XEN B&R Division Chilas |
23-05-2025 |
07-06-2025 |
|
|
|
| 54 |
Construction of Police Stations in Districts of GB (Const. of Excise Police Station Skardu) (Const of Guard Room) |
Final Evaluation Report |
XEN B&R Division Skardu |
26-05-2025 |
10-06-2025 |
|
|
|
| 55 |
Const. of Public Place Barmas Pain Gilgit |
Final Evaluation Report |
XEN Building Division Gilgit |
26-05-2025 |
10-06-2025 |
|
|
|
| 56 |
Upgradation of Water Pumps at Jutial Sakwar & Sonokote Gilgit |
Final Evaluation Report |
XEN PHE Division, Gilgit |
26-05-2025 |
10-06-2025 |
|
|
|
| 57 |
Cons. of Skardu Bypass Road Budha Rock to Sundus Via Branzi Eye Hospital Road Skardu-II |
Final Evaluation Report |
XEN B&R Division Skardu |
27-05-2025 |
11-06-2025 |
|
|
|
| 58 |
Construction of Excise Police Station in 03 Districts of GB |
Final Evaluation Report |
XEN Building Division Gilgit |
30-05-2025 |
14-06-2025 |
|
|
|
| 59 |
Imp/Ext. of Water Supply System Shigar Town, Churka, Hashupi, Pharing Gama, Wazir Pur, Toheedabad , Saisko, Basha, Gulapure, Tissar, Chongo, Biano, Askoli and Provision of Solar Panel Lamsa Shigar (GBLA-12 Shigar)(Imp/Ext. of Water Supply System at Gulab |
Final Evaluation Report |
XEN B&R Division Shigar |
31-05-2025 |
16-06-2025 |
|
|
|
| 60 |
CONST. OF 16.5 FT WIDE LINK ROAD AT QAMRI, LINK ROAD NASIR ABAD, DARBAL GORIKOTE (QAMRI PORTION-IV) |
Final Evaluation Report |
XEN B&R Division Astore |
03-06-2025 |
18-06-2025 |
|
|
|
| 61 |
Supply Installation & Commissioning of Aerial Bunched Cable in Gilgit City |
Final Evaluation Report |
XEN NAHEW Division Gilgit |
04-06-2025 |
19-06-2025 |
|
|
|
| 62 |
Construction of 1.5KM Link Road at Ahmedabad Gorikote (Portion.II) |
Final Evaluation Report |
XEN B&R Division Astore |
05-06-2025 |
20-06-2025 |
|
|
|
| 63 |
Supply Installation & Commissioning of Smart Energy Meters in Gilgit City |
Final Evaluation Report |
XEN NAHEW Division Gilgit |
05-06-2025 |
20-06-2025 |
|
|
|
| 64 |
Provision of Water Supply Line in Various Place of GBLA-8 Skardu-II (Portion-I) |
Final Evaluation Report |
XEN PHE Division, Skardu |
11-06-2025 |
26-06-2025 |
|
|
|
| 65 |
Construction water Reservoir at Ragayul at Skardu |
Final Evaluation Report |
XEN PHE Division, Skardu |
12-06-2025 |
27-06-2025 |
|
|
|
| 66 |
Metaling of 03 KM Road Thore Nullah (Metaling of 2.5KM Road Thore Nullah) |
Final Evaluation Report |
XEN B&R Division Chilas |
12-06-2025 |
27-06-2025 |
|
|
|
| 67 |
Metaling of Road at Barogah Thore Chilas |
Final Evaluation Report |
XEN B&R Division Chilas |
12-06-2025 |
27-06-2025 |
|
|
|
| 68 |
Repair/Maintenance of Water Tank at Ahmedabad Gorikote Astore |
Final Evaluation Report |
XEN B&R Division Astore |
18-06-2025 |
03-07-2025 |
|
|
|
| 69 |
Construction of Link Road Harcho to Immaambargah Astore (Portion-IV) |
Final Evaluation Report |
XEN B&R Division Astore |
24-06-2025 |
09-07-2025 |
|
|
|
| 70 |
Replacement of old Turbo Generating Sets Allied Civil work at Harchu & Gudai Power Houses |
Final Evaluation Report |
XEN Water & Power Division Astore |
24-06-2025 |
09-07-2025 |
|
|
|
| 71 |
Dismantling of Suspension Bridge and Re-Const. of Foot Bridge at Maikyal Village Astore |
Final Evaluation Report |
XEN B&R Division Astore |
25-06-2025 |
10-07-2025 |
|
|
|
| 72 |
UP GRADATION OF LABOR ROOM, IMPROVEMENT OF CHILDREN DEPARTMENT AND PURCHASES EQUIPMENT FOR RHQ HOSPITAL SKARDU (PORTION-II) |
Final Evaluation Report |
XEN PHE Division, Skardu |
30-06-2025 |
15-07-2025 |
|
|
|
| 73 |
ESTABLISHMENT OF DOCTOR HOSTEL (ADDITIONAL WORK) |
Final Evaluation Report |
XEN PHE Division, Skardu |
30-06-2025 |
15-07-2025 |
|
|
|
| 74 |
CONSTRUCTION OF WASH ROOMS / UNDERGROUND & OVERHEAD WATER TANK RHQ HOSPITAL (CONSTRUCTION OF 06 NOS TOILET BLOCK AT RHQ SKARDU |
Final Evaluation Report |
XEN PHE Division, Skardu |
30-06-2025 |
15-07-2025 |
|
|
|
| 75 |
UP GRADATION OF LABOR ROOM, IMPROVEMENT OF CHILDREN DEPARTMENT AND PURCHASES EQUIPMENT FOR RHQ HOSPITAL SKARDU (PORTION-I) |
Final Evaluation Report |
XEN PHE Division, Skardu |
30-06-2025 |
15-07-2025 |
|
|
|
| 76 |
Upgradation of C Class Dispensary to 10 bedded hospital at Farfoo Bagrote GBA-III Gilgit |
Final Evaluation Report |
XEN Building Division Gilgit |
30-06-2025 |
14-07-2025 |
|
|
|
| 77 |
Metaling of existing road from Oshikhandass to Danyore GBA-III Gilgit. |
Final Evaluation Report |
XEN Bridges & Roads Division Gilgit |
09-07-2025 |
25-07-2025 |
|
|
|
| 78 |
Widening of road from KKH to Salamanabad & Widening of road from KKH to Ghulkin Gojal (Const. of 16.5 ft road from Ghulam Karim land to Morain at Ghulkin Gojal) |
Final Evaluation Report |
XEN B&R Division Hunza |
09-07-2025 |
25-07-2025 |
|
|
|
| 79 |
Automation /Digitization of CMIT, GB |
Final Evaluation Report |
Director General Chairman's Inspection Team Gilgit |
11-07-2025 |
26-07-2025 |
|
|
|
| 80 |
Consultancy Services for Design Review and Construction Supervision of Inter-provincial connectivity between Baltistan & Diamer Astore Division (Construction / Metalling of Road from Gorikote Astore to Shagharthang Skardu) |
Final Evaluation Report |
Project Director, IRC Baltistan & Diamer-Astore Division |
29-07-2025 |
05-08-2025 |
|
|
|
| 81 |
Hiring of Contractor for the project "Inter-provincial connectivity between Baltistan & Diamer Astore Division (Construction / Metalling of Road from Gorikote Astore to Shagharthang Skardu)" |
Final Evaluation Report |
Project Director, IRC Baltistan & Diamer-Astore Division |
28-07-2025 |
05-08-2025 |
|
|
|
| 82 |
Metalling of 04 KM Road at Hudur |
Final Evaluation Report |
XEN B&R Division Chilas |
30-07-2025 |
10-08-2025 |
|
|
|
| 83 |
Construction of 20 Bedded Hospital (Female & Child Wing at Tangir) |
Final Evaluation Report |
XEN B&R Division Chilas |
23-08-2025 |
02-09-2025 |
|
|
|
| 84 |
GUST/REST HOUSE AT VILLAGE GAYAL GBLA-17 DIAMER (CM SDG) |
Final Evaluation Report |
XEN B&R Division Chilas |
23-08-2025 |
02-09-2025 |
|
|
|
| 85 |
Drinking Water Supply Scheme for Khani Lichi Thack Nullah Chilas |
Final Evaluation Report |
XEN B&R Division Chilas |
23-08-2025 |
02-09-2025 |
|
|
|
| 86 |
Const. of Regional Setup of EPA Office at Gilgit |
Final Evaluation Report |
XEN Building Division Gilgit |
26-08-2025 |
05-09-2025 |
|
|
|
| 87 |
Vehicle Safety Assurance Certification System (VSACS) Gilgit-Baltistan |
Final Evaluation Report |
Deputy Director Excise & Taxation Gilgit |
02-09-2025 |
10-09-2025 |
|
|
|
| 88 |
Const of Shingle Road in GBA-11 Kharmang District. |
Final Evaluation Report |
XEN B&R Division Kharmang |
02-09-2025 |
10-09-2025 |
|
|
|
| 89 |
Construction of 01 KM Road at Prejote Gorikote (Portion-I) |
Final Evaluation Report |
XEN B&R Division Astore |
10-09-2025 |
19-09-2025 |
|
|
|
| 90 |
COMPLETION OF LEFTOVER WORK OF GOVT RESIDENTIAL QUARTERS ADJACENT TO GB ASSEMBLY (REFURBISHMENT AND RE COMST OF THE TOILETS AND IMPROMENT OF KITCHEN & ELEVATION OF GB HOUSE ISLAMABAD (ADDITIONAL WORK) |
Final Evaluation Report |
XEN Building Division Gilgit |
12-09-2025 |
20-09-2025 |
|
|
|
| 91 |
Construction of 05 KM Link Road at Khanrol to Balchat Parishing Astore (Portion-V) |
Final Evaluation Report |
XEN B&R Division Astore |
23-09-2025 |
03-10-2025 |
|
|
|
| 92 |
Widening of road from KKH to Salmanabad and Widening of road from KKH to Gulkin Gojal (Widening of road from KKH to Salamabad |
Final Evaluation Report |
XEN B&R Division Hunza |
25-09-2025 |
06-10-2025 |
|
|
|
| 93 |
Const. of special Branch Office/ Residence at District Shigar. (Const. of Special Branch Office Shigar. |
Final Evaluation Report |
XEN B&R Division Shigar |
01-10-2025 |
11-10-2025 |
|
|
|
| 94 |
Residential Quarters for Govt. Employees at Chilas (Construction of 01 No. CAT-III QTR for SDO HQ-II B&R Chilas |
Final Evaluation Report |
XEN B&R Division Chilas |
02-10-2025 |
12-10-2025 |
|
|
|
| 95 |
Procurment of Biomedical Equipment (128 Slice CT Scan Machine) under the Deveopment Scheme "Missing Facilities for Shaheed Saif ur Rehman Hospital Gilgit |
Final Evaluation Report |
Director Planning and Procurement Health Department GB |
07-10-2025 |
16-10-2025 |
|
|
|
| 96 |
Imp/Rigid pavement from Barkat House via Afri Muhallah to Forest Check post Choungrah Astore |
Final Evaluation Report |
XEN B&R Division Astore |
13-10-2025 |
23-10-2025 |
|
|
|
| 97 |
Const of Wheat Depot at Sino, Kanday, Lachat, Kondus, Khani saltoro, Ghulshan -e-Kabir Haldi ,Ghurasy and payondo /Raisha( Const of Wheat Depot at Kanday) |
Final Evaluation Report |
XEN B&R Division Ghanche |
15-10-2025 |
25-10-2025 |
|
|
|
| 98 |
HARNESSING INVATION FOR TRANSFORMATIONAL ECNOMIC IMPECT (ESTABLISHMENT OF MODEL TROUT COMPLEX AT VILLAGE DATUCHI BAGROTE VALLEY DISTRICT GILGIT. |
Final Evaluation Report |
XEN Building Division Gilgit |
15-10-2025 |
25-10-2025 |
|
|
|
| 99 |
CONST OF WHEAT DEPOT AT SINO, KANDAY LACHAT KONDUS, KHANI SALTORO, GHULSHAN-E-KABIR, HALDI GHURSAY AND PAYOUNDO/RASHIA (CONST OF WHEAT DEPOT AT KHANI (PACKAGE NO-4) |
Final Evaluation Report |
XEN B&R Division Ghanche |
17-10-2025 |
27-10-2025 |
|
|
|
| 100 |
Re-Alignment of Road from Kanday to Hushey Ghanche |
Final Evaluation Report |
XEN B&R Division Ghanche |
17-10-2025 |
27-10-2025 |
|
|
|
| 101 |
CONST OF WHEAT DEPOT AT SINO, KANDAY LACHAT KONDUS, KHANI SALTORO, GHULSHAN-E-KABIR, HALDI GHURSAY AND PAYOUNDO/RASHIA (CONST OF WHEAT DEPOT AT HALDI) |
Final Evaluation Report |
XEN B&R Division Ghanche |
17-10-2025 |
27-10-2025 |
|
|
|
| 102 |
CONST OF WHEAT DEPOT AT SINO, KANDAY LACHAT KONDUS, KHANI SALTORO, GHULSHAN-E-KABIR, HALDI GHURSAY AND PAYOUNDO/RASHIA (CONST OF WHEAT DEPOT AT PAYOUNDO) |
Final Evaluation Report |
XEN B&R Division Ghanche |
17-10-2025 |
27-10-2025 |
|
|
|
| 103 |
Civil Work |
Final Evaluation Report |
XEN B&R Division Ghanche |
22-10-2025 |
31-10-2025 |
|
|
|
| 104 |
Re-carpeting of road Chaqchan to Hipi Khaplu |
Final Evaluation Report |
XEN B&R Division Ghanche |
22-10-2025 |
31-10-2025 |
|
|
|
| 105 |
Const. Improvement of Basho and Basingo Road (Imp. of Basho and Basingo Road. Imp of Sharp Bends Existing Road at Bashingo Astana |
Final Evaluation Report |
XEN B&R Division Skardu |
24-10-2025 |
05-11-2025 |
|
|
|
| 106 |
Re-location of Greater Water Supply Pipes from Gamsing Nullah to Play Ground Damas at Gahkuch |
Final Evaluation Report |
XEN B&R Division Ghizer |
27-10-2025 |
07-11-2025 |
|
|
|
| 107 |
Imp of Existing Road & Const. of Side Drain and Causway from Ronka to Brokshal Gonkhan Bilamik |
Final Evaluation Report |
XEN B&R Division Skardu |
30-10-2025 |
10-11-2025 |
|
|
|
| 108 |
Construction of foot path in Gilgit city |
Final Evaluation Report |
Executive Engineer LG&RD Gilgit |
30-10-2025 |
10-11-2025 |
|
|
|
| 109 |
Const. of Link Road GBLA-12 at Shigar (Ph-I) Const. of Link Rpoad Braqchan Shigar, L/R Helam Grong capt (Rtd) Mehdi House to Karim House, L/R Kinapi to Ranga Marapi, L/R Bunpa to Daskhore, L/R Thouthonpi Churka and L/R Guest House (Yati Inn) to Qatilgah A |
Final Evaluation Report |
XEN B&R Division Shigar |
30-10-2025 |
10-11-2025 |
|
|
|
| 110 |
Const. of Link Roads in GBA-20 Halqa-II Ghizer (Const. of Link Roads in GBA-20 Halqa-II (Part-II) |
Final Evaluation Report |
XEN B&R Division Ghizer |
03-11-2025 |
13-11-2025 |
|
|
|
| 111 |
Const./Improvement and Metalling of Internal Roads i/c Small RCC Bridges in GBA-21 (Const. of Link Roads in Sandi & Gojalti Area (Part-I) |
Final Evaluation Report |
XEN B&R Division Ghizer |
03-11-2025 |
13-11-2025 |
|
|
|
| 112 |
Const. of 380 Rft Span Suspension Bridge at Shulja District Ghizer (Const. of Suspension Bridge Shulja (Part-I)) |
Final Evaluation Report |
XEN B&R Division Ghizer |
03-11-2025 |
13-11-2025 |
|
|
|
| 113 |
Construction of Water Tank at Shabnal Tangir |
Final Evaluation Report |
XEN B&R Division Chilas |
05-11-2025 |
15-11-2025 |
|
|
|
| 114 |
UP-gradation of "A" Class Dispensary Goma Ghursay and Surmo to BHU, Up-gradation of C Class Dispensary Ghulshan-e-Kabir to A Class, and Construction of "C" Class Dispensary at Khari Machulu (Up-gradation of "A" Class Dispensary at Surmo to BHU) |
Final Evaluation Report |
XEN B&R Division Ghanche |
06-11-2025 |
16-11-2025 |
|
|
|
| 115 |
UP-GRADATION FOR "A CLASS DISPENSAR GHURSAY AND SURMO BHU UP-GRADATION OF "C" CLASS DISPENSARY GHULSHAN-I KABIR "A" CLASS AND CONSTRUCTION OF "C" CLASS DISPENSARY AT KHARI MUCHULO (UP-GRADATION OF "A" CLASS DISPENSARY AT GOMA GHRUSAY TO BHU). |
Final Evaluation Report |
XEN B&R Division Ghanche |
06-11-2025 |
16-11-2025 |
|
|
|
| 116 |
REPAIR / RENOVATION OF ps OFFICE KITCHEN DISPATCH ROOM AND TWO NOS BATHROOMS AT HOME & PRISON DEPARTMENT GB |
Final Evaluation Report |
XEN Building Division Gilgit |
06-11-2025 |
16-11-2025 |
|
|
|
| 117 |
CONST. OF LINK ROAD FROM GHASING TO GHASING (Phase-I) |
Final Evaluation Report |
XEN B&R Division Kharmang |
06-11-2025 |
16-11-2025 |
|
|
|
| 118 |
Feasibility Study of Lift Irrigation and Water Supply etc in CBA-II Kharmang |
Final Evaluation Report |
XEN B&R Division Kharmang |
06-11-2025 |
16-11-2025 |
|
|
|
| 119 |
Widening/Construction of Link roads in GBA-20 Ghizer (Const. of Link road 16.5ft wide from Dalumal Link Roads to Abdul Jahan House at Dalumal (Part-IV) |
Final Evaluation Report |
XEN B&R Division Ghizer |
07-11-2025 |
14-11-2025 |
|
|
|
| 120 |
Feasibility study and Detail designing for construction of RCC Bridge at Pion Chorbat Ghanche |
Final Evaluation Report |
XEN B&R Division Ghanche |
07-11-2025 |
17-11-2025 |
|
|
|
| 121 |
Const. of RCC Bridge at Shigar |
Final Evaluation Report |
XEN B&R Division Shigar |
11-11-2025 |
21-11-2025 |
|
|
|
| 122 |
Outsourcing of LG&RD Rest House Chutroun Shigar |
Final Evaluation Report |
Deputy Director LG&RD Shigar |
12-11-2025 |
19-11-2025 |
|
|
|
| 123 |
CONST OF WHEAT DEPOT AT SINO, KANDAY LACHAT KONDUS, KHANI SALTORO, GHULSHAN-E-KABIR, HALDI GHURSAY AND PAYOUNDO/RASHIA (CONST OF WHEAT DEPOT AT LASHAT KONDUS) |
Final Evaluation Report |
XEN B&R Division Ghanche |
12-11-2025 |
18-11-2025 |
|
|
|
| 124 |
Construction of RCC Bridge at Shitten Nullah Thore |
Final Evaluation Report |
XEN B&R Division Chilas |
13-11-2025 |
19-11-2025 |
|
|
|
| 125 |
CONST OF VET DISPENSARY AT TAISOTE BAGROTE HANUCHAL HARAMOSH AD OSHIKHANDASS GILGIT (CONST OF VET DISPENSARY AT TAISOTE BAGROTE) |
Final Evaluation Report |
XEN Building Division Gilgit |
14-11-2025 |
21-11-2025 |
|
|
|
| 126 |
CONST OF VET DISPENSARY AT TAISOTE BAGROTE HANUCHAL HARAMOSH AD OSHIKHANDASS GILGIT (UP-GRADATION OF VET DISPENSARY INTO HOSPITAL AT OSHIKHANDASS GILGIT. |
Final Evaluation Report |
XEN Building Division Gilgit |
14-11-2025 |
21-11-2025 |
|
|
|
| 127 |
Construction of Civil Dispensary at Braldo Valley (Sino Braldo) |
Final Evaluation Report |
XEN B&R Division Shigar |
17-11-2025 |
25-11-2025 |
|
|
|
| 128 |
Re-Const. of damaged RCC Bridge at Soqgo Gulabpure (Flood Emergency Work) |
Final Evaluation Report |
XEN B&R Division Shigar |
17-11-2025 |
25-11-2025 |
|
|
|
| 129 |
Const. of A Class Disp. at Basha(Doghoro) & Braldo (Saider) |
Final Evaluation Report |
XEN B&R Division Shigar |
17-11-2025 |
25-11-2025 |
|
|
|
| 130 |
Const. of Link Road GBLA-12 at Shigar (Ph-I) Const. of Link Road Riser Churkah, L/R Shaikh Sahar Road Churkah & Const. of L/R Sarfakhore Churkah Shigar (Portion-II) |
Final Evaluation Report |
XEN B&R Division Shigar |
17-11-2025 |
25-11-2025 |
|
|
|
| 131 |
Const. of link road GBLA-12 at Shigar (Ph-I) Const. of link road Dasso Bala, L/R road Sildi and Restoration of road Faringbama Hashupi Shigar (Portion-III) |
Final Evaluation Report |
XEN B&R Division Shigar |
17-11-2025 |
25-11-2025 |
|
|
|
| 132 |
Construction of wooden bridge at Imamabad, Gojal Hunza, Metaling & construction of road from KKH to Old Sost Valley (Construction of wooden suspension bridge 250 feet Imamabad Khudaabad Gojal & Construction of protective Bund). |
Final Evaluation Report |
XEN B&R Division Hunza |
20-11-2025 |
27-11-2025 |
|
|
|
| 133 |
Construction of C Class Dispensary at Qadar Muhammad Muhallah Manikal Darel |
Final Evaluation Report |
XEN B&R Division Chilas |
20-11-2025 |
27-11-2025 |
|
|
|
| 134 |
Construction of Naib Tehsildar Office at Dodoshal and Khanbary Darel |
Final Evaluation Report |
XEN B&R Division Chilas |
20-11-2025 |
27-11-2025 |
|
|
|
| 135 |
Construction of C Class Dispensary at Choudary Jaffar Land Chardai Fitot Nullah Thore |
Final Evaluation Report |
XEN B&R Division Chilas |
20-11-2025 |
27-11-2025 |
|
|
|
| 136 |
Construction of 03 Class Dispensary at Darel Area (Plate Village, Nazal jeel, Shugrry Village Diamer |
Final Evaluation Report |
XEN B&R Division Chilas |
20-11-2025 |
27-11-2025 |
|
|
|
| 137 |
Construction of 02 Nos MCH Center in Sair Khanbary and Yashout Darel |
Final Evaluation Report |
XEN B&R Division Chilas |
20-11-2025 |
27-11-2025 |
|
|
|
| 138 |
Construction of Link Road in Khanbary and Dodoshal and Water Channel at Kakote Khanbary |
Final Evaluation Report |
XEN B&R Division Chilas |
20-11-2025 |
27-11-2025 |
|
|
|
| 139 |
Const. of MCH Center Mani Shani Bala Khanbary Darel District Diamer |
Final Evaluation Report |
XEN B&R Division Chilas |
20-11-2025 |
27-11-2025 |
|
|
|
| 140 |
Construction of Water Tank for Danyore, Muhammadabad & Sultanabad |
Final Evaluation Report |
Executive Engineer LG&RD Gilgit |
27-11-2025 |
04-12-2025 |
|
|
|
| 141 |
Construction of GB PWD Office and residence at Shigar (Const. of GB PWD Office at Shigar) Portion-I |
Final Evaluation Report |
XEN B&R Division Shigar |
05-12-2025 |
15-12-2025 |
|
|
|
| 142 |
Const. of A Class Disp. at Basha (Doghoro) and Braldo (Saider) |
Final Evaluation Report |
XEN B&R Division Shigar |
05-12-2025 |
15-12-2025 |
|
|
|
| 143 |
Conversion of small Suspension Bridge into RCC Brides (Class-70) at Kolalote, ZAil and Furcha Astore, Construction of approach road 03 Nos RCC Bridge at ZAil Bubin & Shikong |
Final Evaluation Report |
XEN B&R Division Astore |
05-12-2025 |
16-12-2025 |
|
|
|
| 144 |
Repair/Rehabiliation of 12 MTR RCC Bridge at Guomsar Perishing Astore |
Final Evaluation Report |
XEN B&R Division Astore |
06-12-2025 |
16-12-2025 |
|
|
|
| 145 |
Metaling of Road from RCC Bridge Umalsat to Darkot |
Final Evaluation Report |
XEN B&R Division Ghizer |
09-12-2025 |
18-12-2025 |
|
|
|
| 146 |
General Overhauling of Wheel Dozer Komatsu-II WA-200 |
Final Evaluation Report |
XEN B&R Division Astore |
10-12-2025 |
21-12-2025 |
|
|
|
| 147 |
Construction of roads and treks at District Hunza (Part-II) |
Final Evaluation Report |
XEN B&R Division Hunza |
12-12-2025 |
22-12-2025 |
|
|
|
| 148 |
Metaling of road from Chief Secretary Office to Bicho chowk Amphary. |
Final Evaluation Report |
XEN Bridges & Roads Division Gilgit |
12-12-2025 |
22-12-2025 |
|
|
|
| 149 |
Construction of GB PWD Office and residence at Shigar (Const. of Cat-II Qtr (Xen House at Shigar Town) Portion-II |
Final Evaluation Report |
XEN B&R Division Shigar |
18-12-2025 |
28-12-2025 |
|
|
|
| 150 |
REVALIDATION OF CONSULTANCY SERVICES FOR CONSTRUCTION OF RESIDENTIAL BUILDINGS OF HON,BLE JUDGES OF CHIEF COURT (CONSTRUCTION OF GILGIT BALTISTAN CHIEF COURT / HIGH COURT BUILDING) |
Final Evaluation Report |
XEN Building Division Gilgit |
19-12-2025 |
29-12-2025 |
|
|
|
| 151 |
Metalling of the road from RCC Bridge Khudaabad to Wooden Suspension bridge and Metalling of the road from Karakuram Highway to Sirteez Gojal |
Final Evaluation Report |
XEN B&R Division Hunza |
22-12-2025 |
31-12-2025 |
|
|
|
| 152 |
Detail feasibility study for construction of Shimshal road and Construction of RCC Bridges |
Final Evaluation Report |
XEN B&R Division Hunza |
19-12-2025 |
28-12-2025 |
|
|
|
| 153 |
Const. of road Khumit to Mashiber Nullah at Thoi Yasin (Const. Simply Supported RCC Bridge Khumit Nullah 60 rft |
Final Evaluation Report |
XEN B&R Division Ghizer |
24-12-2025 |
31-12-2025 |
|
|
|
| 154 |
Carpeting of 2.5 KM road Gojalti Molaabad Sumal GBA-21 (Const. of 12 ft wide metalling of road at Mollabad Village (Part-I) |
Final Evaluation Report |
XEN B&R Division Ghizer |
24-12-2025 |
31-12-2025 |
|
|
|
| 155 |
Execution of Civil Component of PMRU (Repair/Renovation & Furniture Fixture of PMRU in the old office of Secretary Health) |
Final Evaluation Report |
XEN Building Division Gilgit |
30-12-2025 |
10-01-2026 |
|
|
|
| 156 |
Const. of C Class /dispensary at Surmo Khar and Farol (Const of C Dispensary at Surmo Khar (Package-I)) |
Final Evaluation Report |
XEN B&R Division Ghanche |
30-12-2025 |
09-01-2026 |
|
|
|
| 157 |
Const. of Civil Supply Godown Nazbar, Nolti, Qurkulti & Umalsat Yasin |
Final Evaluation Report |
XEN B&R Division Ghizer |
30-12-2025 |
10-01-2026 |
|
|
|
| 158 |
Const. of Road Khumit to Mashibar Nullah at Thoi Yasin (Const. of Pre Stresses RCC Bridge near Kuno Shot Suspension Bridge 118ft(36Mtr) Span (Part-IV) |
Final Evaluation Report |
XEN B&R Division Ghizer |
30-12-2025 |
10-01-2026 |
|
|
|
| 159 |
Const. of Small RCC Bridge Hilbi Village Barkolti Yasin |
Final Evaluation Report |
XEN B&R Division Ghizer |
30-12-2025 |
10-01-2026 |
|
|
|
| 160 |
Const. of remaining work Thoi Road Yasin |
Final Evaluation Report |
XEN B&R Division Ghizer |
30-12-2025 |
10-01-2026 |
|
|
|
| 161 |
Up-Gradation of A-Class Dispensary to 10 Bedded Hospital at Tormik Roundu |
Final Evaluation Report |
XEN PHE & Building Division Skardu |
02-01-2026 |
12-01-2026 |
|
|
|
| 162 |
Town planning of gamba Skardu corridor from cadet college to radio Pakistan chowk (Supply of different items for identification of potential for extraction of underground water in Halqa-II Skardu. |
Final Evaluation Report |
XEN PHE & Building Division Skardu |
02-01-2026 |
12-01-2026 |
|
|
|
| 163 |
Const. of link Road and land compensation of link road Frano Ghanche |
Final Evaluation Report |
XEN B&R Division Ghanche |
08-01-2026 |
16-01-2026 |
|
|
|
| 164 |
GREATER WATER SUPPLY SCHEME JUGLOTE SUB DIVISION BUNNERDASS & MINIMARG. |
Final Evaluation Report |
XEN PHE Division, Gilgit |
06-01-2026 |
16-01-2026 |
|
|
|
| 165 |
Construction of Roads & Treks at District Hunza (Part-III) |
Final Evaluation Report |
XEN B&R Division Hunza |
09-01-2026 |
16-01-2026 |
|
|
|
| 166 |
Construction of Primary School Bujyote Yasin |
Final Evaluation Report |
Executive Engineer Works(Education) Gilgit Division |
10-01-2026 |
17-01-2026 |
|
|
|
| 167 |
Metaling of Road from Nomal Chowk Nalter Expressway to KKH |
Final Evaluation Report |
XEN Bridges & Roads Division Gilgit |
12-01-2026 |
20-01-2026 |
|
|
|
| 168 |
Const. of link road at UC Kharkoo Balghar, Daghoni and Keris Nullah (Const of link road at Keris Nullah and Orowa Keris) |
Final Evaluation Report |
XEN B&R Division Ghanche |
14-01-2026 |
26-01-2026 |
|
|
|
| 169 |
Final Evaluation Report of District Nagar (05 Components) & District Ghizer (04 Components) |
Final Evaluation Report |
Executive Engineer Works(Education) Gilgit Division |
15-01-2026 |
25-01-2026 |
|
|
|
| 170 |
Water Supply Scheme Through Lift Pump to Sirteez from Gircha Gojal |
Final Evaluation Report |
XEN B&R Division Hunza |
15-01-2026 |
28-01-2026 |
|
|
|